About your Search

20121205
20121205
Search Results 0 to 0 of about 1
put up to protect city residents, visitors and the park land during the construction. this is a very large event with very large heavy machinery operating throughout various times of the event. and fencing is frankly required, as it would be at any construction site, during the build and the tear down. in recent years we've actually encouraged another planet to be more deliberate during the construction of the events, whereas three years ago we began the construction on the friday before the event. our gardeners over the last few years have advocated for us to begin that construction a couple days earlier so that it can go at a slower pace and we can be ensured the park is protected better. we do work to minimize the impact of the fencing. it is phased, the construction, so it begins in the polo fields and expands out into the surrounding meadows as the construction begins in those meadows. we do work after the event to then phase the breakdown so that the breakdown happens in that surrounding meadows, first in those meadows reopen to the public first, and it is completed lastly at t
Search Results 0 to 0 of about 1